Before laying the underlay, the cement underlay needs to be isolated with 0.2 mm thick, quasi-isolating foil.
The base should be clean, dry, and even.
Underlay mats should be laid grooved-side down and connected like puzzle pieces.
The underlay should be laid at a 90° angle to the direction the floor panels will be laid in.